网页如何导出excel:请帮我翻译下面的

来源:百度文库 编辑:中科新闻网 时间:2024/05/03 06:55:37
1.actual mechanical and chemical data from each heat/lot shall be recorded by the beam supplier prior to shipment of material.
2during the first three heat/lot manufactured by the beam supplier,a minimum of two beams should be destructively tested (one at the begining and one at the end of the heat/lot)

1.实际机械和化工数据从各热全部将由射线供应商记录在材料的发货之前。
2在第一三热全部由射线供应商制造,二条射线极小值应该破坏性地被测试(一个在开头和一个在热的结尾全部)

每个实际数据和化学热机械/多光束应记录的前运输物资供应. 前三个热/多光束制造商期间,至少应两束太测试(在一月底的开始热/多)