股票交易电影:翻译又来了

来源:百度文库 编辑:中科新闻网 时间:2024/04/30 01:47:30
A separate line is considered to be any section of process pipe work.Every such section of line is given a line number consisting of six elements arranged as describled below.The process ductwork bears a separate equipment number in the Process Flow Diagram is considered to be process equipment,not part of the piping.
这么多高手,这么点就嫌长了,要短了我自己就搞定了

太长了。