Construction phase

Main building contract
Preliminaries
Mobilisation
Site clearance
Steel fabrication
Stage 1-PUB &conversion area(GL5-13/A-I)
Filling
Piling
Ground beams and perimeter downstands
Steel frame erection
Roof cladding
Wall cladding
Ground floor slab
1st floor slab to PUB
Base building MEP fit out
Base building MEP T&C
Early access PUB
Early access conversion area
Stage2-warehouse(GL14-18/A-I)
Filling
Piling
Ground beams and perimeter downstands
Steel frame erection
Roof cladding
Wall cladding
Ground floor slab
Base building MEP fit out
Base building MEP T&C
Access to install transformers
Access to install warehouse equipment
Stage3-factory(GL1-5/A-I)
Filling
Piling
Ground beams and perimeter downstands
Steel frame erection
Roof cladding
Wall cladding
Ground floor slab
1st floor slab to PUB
Base building MEP fit out
Base building MEP T&C
Access to install process equipment
External works
Bridge link &modification to existing building
Underground services and drainage
Access roads and loading areas
Fs inspection
FS inspection
Process equipment contract
Line 1 to 4 process equipment to conversion room
Install bale opener & reserve tower
T&C bale opener & reserve tower
Install FSC
Install chilled water system
Install process HVAC system
T&C FSC,CWS & process HAVC systems
Install compressed air system
T&C compressed air system
Install utilites in convertor area
Install converter
T&C converter
Trial run
Ready for production

建筑阶段

主要大厦合同
初阶
动员
站点清除
钢制造
阶段1-PUB &conversion area(GL5-13/A-I)
装填
打桩
地面射线和周长downstands
钢框架架设
屋顶金属
墙壁金属
底层平板
第1 块楼平板对PUB
基本的楼MEP 装备
基本的楼MEP T&C
早期的通入PUB
早期通入转换区域
Stage2-warehouse(GL14-18/A-I)
装填
打桩
地面射线和周长downstands
钢框架架设
屋顶金属
墙壁金属
底层平板
基本的楼MEP 装备了
基本的楼MEP T&C
访问安装变压器
访问安装仓库设备
Stage3-factory(GL1-5/A-I)
装填
打桩
地面射线和周长downstands
钢框架架设
屋顶金属
墙壁金属
底层平板
第1 块楼平板对PUB
基本的楼MEP 装备了
基本的楼MEP T&C
访问安装处理设备
外部工作
桥梁链接&modification 对现有的大厦
地下服务和排水设备
通路和装货区域
Fs 检查
FS 检查
处理设备合同
线1 到4 处理设备对转换室
安装大包开启者& 储备塔
T&C 大包开启者& 储备塔
安装FSC
安装变冷的水系统
安装处理HVAC 系统
T&C FSC,CWS & 处理HAVC 系统
安装压缩空气系统
T&C 压缩空气系统
安装utilites 在交换器区域
安装交换器
T&C 交换器
试航
为生产准备